| 8-K | | DIAMOND OFFSHORE DRILLING INC filed this Form 8-K on 10/23/08 | | | << Previous Page | Next Page >> |
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, DC 20549
FORM 8-K
CURRENT REPORT
Pursuant to Section 13 or 15(d) of the
Securities Exchange Act of 1934
Date of report (Date of earliest event reported): October 23, 2008
Diamond Offshore Drilling, Inc.
(Exact Name of Registrant as Specified in Charter)
| |
|
|
|
|
| Delaware
|
|
1-13926
|
|
76-0321760 |
| |
|
|
|
|
| (State or Other Jurisdiction
|
|
(Commission File Number)
|
|
(IRS Employer |
| of Incorporation)
|
|
|
|
Identification No.) |
15415 Katy Freeway
Houston, Texas 77094
(Address of Principal Executive Offices and Zip Code)
Registrants telephone number, including area code: (281) 492-5300
Not Applicable
(Former name or former address, if changed since last report)
Check the appropriate line below if the Form 8-K filing is intended to simultaneously satisfy
the filing obligation of the registrant under any of the following provisions:
|
|
|
| o |
|
Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
|
|
|
|
| o |
|
Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
|
|
|
|
| o |
|
Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
|
|
|
|
| o |
|
Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))
|
|
|
|
| Item 7.01. |
|
Regulation FD Disclosure |
Diamond Offshore Drilling, Inc. (the Company) hereby incorporates by reference into this
Item 7.01 the summary report of the status, as of October 23, 2008, of the Companys offshore
drilling rigs attached as Exhibit 99.1, which is being furnished in accordance with Rule 101(e)(1)
under Regulation FD and shall not be deemed to be filed for purposes of Section 18 of the
Securities Exchange Act of 1934, as amended, and will not be incorporated by reference into any
registration statement filed under the Securities Act of 1933, as amended, unless specifically
identified therein as being incorporated by reference.
Statements in this report that contain forward-looking statements within the meaning of
Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange
Act of 1934, as amended, include, but are not limited to, statements regarding the current term,
future dayrates, start and end dates and comments concerning future contracts and availability,
letters of intent, utilization, surveys, downtime and other aspects of the Companys drilling rigs,
as well as statements concerning rigs being upgraded or to be upgraded and rigs under construction.
Such statements are inherently subject to a variety of assumptions, risks and uncertainties that
could cause actual results to differ materially from those anticipated or projected. A discussion
of the risk factors that could impact these areas and the Companys overall business and financial
performance can be found in the Companys reports and other documents filed with the Securities and
Exchange Commission. These factors include, among others, general economic and business
conditions, operating risks, casualty losses, industry fleet capacity, changes in foreign and
domestic oil and gas exploration and production activity, competition, changes in foreign,
political, social and economic conditions, regulatory initiatives and compliance with governmental
regulations, customer preferences and various other matters, many of which are beyond the Companys
control. Given these concerns, investors and analysts should not place undue reliance on
forward-looking statements. Each forward-looking statement speaks only as of the date of the rig
status report, and the Company undertakes no obligation to publicly update or revise any
forward-looking statement.
|
|
|
| Item 9.01. |
|
Financial Statements and Exhibits |
| |
|
|
| Exhibit number |
|
Description |
|
|
|
99.1
|
|
Rig Status Report as of October 23, 2008 |
2
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the Company has duly
caused this report to be signed on its behalf by the undersigned hereunto duly authorized.
| |
|
|
|
|
| |
DIAMOND OFFSHORE DRILLING, INC.
|
|
| |
By: |
/s/ William C. Long
|
|
| |
|
William C. Long |
|
| Dated: October 23, 2008 |
|
Senior Vice President, General Counsel and
Secretary |
|
| |
3
EXHIBIT INDEX
| |
|
|
| Exhibit number |
|
Description |
|
|
|
99.1
|
|
Rig Status Report as of October 23, 2008 |
4
Exhibit 99.1
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
October 23, 2008
| |
|
|
| RECENT COMMITMENTS (See Body of Report For Contract Details/Date Changes and Other Information) |
| |
Ocean Valiant
|
|
Two years in Angola |
| |
Ocean Saratoga
|
|
16 months in the GOM |
| |
Ocean Champion
|
|
Six months in the GOM |
| |
Ocean Summit
|
|
One well |
| |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
Dayrate |
|
|
|
Est. End |
| Rig Name |
|
WD |
|
Location |
|
Status |
|
Operator |
|
Current Term |
|
($000s) |
|
Start Date |
|
Date |
| |
| Domestic Deepwater Semisubmersibles (8) |
|
|
|
|
|
|
|
|
|
|
Ocean Quest
|
|
3,500
|
|
GOM
|
|
Current Contract
|
|
Noble
|
|
two-year term + unpriced option
|
|
upper 350s
|
|
mid June 2007
|
|
mid June 2009 |
|
|
|
|
GOM/Brazil
|
|
Prep, mobe & acceptance test for OGX
|
|
OGX
|
|
|
|
|
0 |
|
|
mid June 2009
|
|
early Oct. 2009 |
|
|
|
|
Brazil
|
|
Future Contract
|
|
OGX
|
|
two-year term + unpriced option
|
|
low 420s
|
|
early Oct. 2009
|
|
early Oct. 2011 |
Ocean Star
|
|
5,500
|
|
GOM
|
|
Current Contract
|
|
Anadarko
|
|
term extension
|
|
upper 410s
|
|
late Nov. 2007
|
|
early Dec. 2008 |
Ocean America
|
|
5,500
|
|
GOM
|
|
Current Contract
|
|
Mariner
|
|
Part 1 18-month term
|
|
low 470s
|
|
mid March 2008
|
|
late Oct. 2008 |
|
|
|
|
GOM
|
|
Future Contract
|
|
LOI
|
|
Remainder term.
|
|
low 520s
|
|
late Oct. 2008
|
|
early Jan. 2009 interrupt term |
|
|
|
|
GOM
|
|
Special Survey & Maintenance
|
|
DODI
|
|
|
|
|
0 |
|
|
early Jan. 2009
|
|
late March 2009 |
|
|
|
|
GOM
|
|
Future Contract
|
|
LOI
|
|
Cont. remainder term
|
|
low 520s
|
|
late
March 2009
|
|
mid July 2010 |
Ocean Valiant
|
|
5,500
|
|
GOM
|
|
Special Survey & Maintenance
|
|
DODI
|
|
|
|
|
0 |
|
|
early Aug. 2008
|
|
late Nov. 2008 resume contract |
|
|
|
|
GOM
|
|
Current Contract
|
|
Anadarko
|
|
resume one-year term extension
|
|
upper 420s
|
|
late Nov. 2008
|
|
mid July 2009 |
|
|
|
|
Mobe
|
|
Lump sum mobe
|
|
DODI
|
|
|
|
|
|
|
|
mid July 2009
|
|
mid Sept. 2009 |
|
|
|
|
Angola
|
|
Future Contract
|
|
Total
|
|
two-year term + priced options
|
|
low 620s
|
|
mid Sept. 2009
|
|
mid Sept. 2011 |
Ocean Victory
|
|
5,500
|
|
GOM
|
|
Current Contract
|
|
Callon
|
|
two wells
|
|
low 500s
|
|
mid Aug. 2008
|
|
early March 2009 |
|
|
|
|
GOM
|
|
Future Contract (swap from old Voyager contract in low 300s)
|
|
Newfield
|
|
one well
|
|
low 300s
|
|
early March 2009
|
|
early May 2009 |
|
|
|
|
GOM
|
|
Future Contract
|
|
Newfield
|
|
one well extension
|
|
low 500s
|
|
early May 2009
|
|
mid June 2009 |
|
|
|
|
GOM
|
|
Future Contract
|
|
ATP
|
|
one-year term, minimum
|
|
low 540s
|
|
mid June 2009
|
|
mid June 2010 |
Ocean Baroness
|
|
7,000
|
|
GOM
|
|
Current Contract
|
|
Hess
|
|
term extension +unpriced option
|
|
mid 360s
|
|
late Nov. 2007
|
|
mid April 2010 |
Ocean Confidence
|
|
10,000
|
|
GOM
|
|
Current Contract
|
|
Murphy
|
|
four-year term + unpriced option
|
|
low 500s
|
|
late Feb. 2008
|
|
late March 2012 |
Ocean Endeavor
|
|
10,000
|
|
GOM
|
|
Current Contract
|
|
Devon
|
|
four-year term + unpriced option
|
|
mid 260s
|
|
early July 2007
|
|
late June 2011 |
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
October 23, 2008
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
Dayrate |
|
|
|
Est. End |
| Rig Name |
|
WD |
|
Location |
|
Status |
|
Operator |
|
Current Term |
|
($000s) |
|
Start Date |
|
Date |
| |
| Domestic 2nd and 3rd Generation Semisubmersibles (2) |
|
|
|
|
|
|
|
|
|
|
Ocean Ambassador
|
|
1,100
|
|
GOM
|
|
Special Survey & Maintenance (storm delayed)
|
|
DODI
|
|
|
|
|
0 |
|
|
early Aug. 2008
|
|
late Nov. 2008 |
|
|
|
|
GOM
|
|
Future Contract
|
|
Taylor
|
|
seven-month term
|
|
mid 280s
|
|
late Nov. 2008
|
|
early June 2009 |
|
|
|
|
GOM/Brazil
|
|
Prep, mobe & acceptance test for OGX
|
|
OGX
|
|
|
|
|
0 |
|
|
early June 2009
|
|
mid Sept. 2009 |
|
|
|
|
Brazil
|
|
Future Contract
|
|
OGX
|
|
three-year term + unpriced option
|
|
low 260s
|
|
mid Sept. 2009
|
|
mid Sept. 2012 |
Ocean Saratoga
|
|
2,200
|
|
GOM
|
|
Current Contract
|
|
Walter
|
|
one well
|
|
mid 280s
|
|
late July 2008
|
|
late Oct. 2008 |
|
|
|
|
Gom
|
|
Future Contract
|
|
Deep Gulf
|
|
one well
|
|
mid 280s
|
|
late Oct. 2008
|
|
late Nov. 2008 |
|
|
|
|
GOM
|
|
Future Contract
|
|
Walter
|
|
four wells
|
|
mid 280s
|
|
late Nov. 2008
|
|
late March 2009 |
|
|
|
|
GOM
|
|
Future Contract
|
|
Taylor
|
|
16-month term
|
|
mid 280s
|
|
late March 2009
|
|
mid July 2010 |
| |
Domestic Jack-ups (7) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ocean Crusader
|
|
200 MC
|
|
GOM
|
|
Current Contract
|
|
Walter
|
|
two wells
|
|
mid 70s
|
|
mid Oct. 2008
|
|
late Dec. 2008 |
Ocean Drake
|
|
200 MC
|
|
GOM
|
|
Special Survey & Maintenance (storm delayed)
|
|
DODI
|
|
|
|
|
0 |
|
|
early Aug. 2008
|
|
late Oct. 2008 |
|
|
|
|
GOM
|
|
Future Contract
|
|
Tarpon
|
|
one well
|
|
mid 60s
|
|
late Oct. 2008
|
|
mid Dec. 2008 |
|
|
|
|
GOM
|
|
Future Contract
|
|
Tarpon
|
|
two wells
|
|
mid 70s
|
|
mid Dec. 2008
|
|
mid Feb. 2009 |
Ocean Champion
|
|
250 MS
|
|
GOM
|
|
Current Contract
|
|
Stone
|
|
Assignment from Bois dArc
|
|
mid 60s
|
|
early Sept. 2008
|
|
late Oct. 2008 |
|
|
|
|
GOM
|
|
Future Contract
|
|
Stone
|
|
six months + unpriced option
|
|
low 70s
|
|
late Oct. 2008
|
|
late April 2009 |
Ocean Spartan
|
|
300 IC
|
|
GOM
|
|
Current Contract
|
|
Samson
|
|
four wells
|
|
low 100s
|
|
early Oct. 2008
|
|
early Nov. 2008 |
|
|
|
|
GOM
|
|
Future Contract
|
|
Samson
|
|
two-well extension, part 1
|
|
low 100s
|
|
early Nov. 2008
|
|
mid Dec. 2008 |
|
|
|
|
GOM
|
|
Future Contract
|
|
Samson
|
|
two-well extension, part 2
|
|
low 120s
|
|
mid Dec. 2008
|
|
late Dec. 2008 |
Ocean Summit
|
|
300 IC
|
|
GOM
|
|
Current Contract
|
|
Energy Partners
|
|
five-wells + unpriced option
|
|
low 100s
|
|
mid Sept. 2008
|
|
interrup current contract late Oct. 2008 |
|
|
|
|
GOM
|
|
Future Contract
|
|
W&T
|
|
one 10-day well
|
|
low 140s
|
|
late Oct. 2008
|
|
late Oct. 2008 |
|
|
|
|
GOM
|
|
Resume Current Contract
|
|
Energy Partners
|
|
five-wells + unpriced option
|
|
low 100s
|
|
late Oct. 2008
|
|
mid Dec. 2008 |
Ocean Titan
|
|
350 IC
|
|
GOM
|
|
Current Contract
|
|
Apache
|
|
second of three wells
|
|
high 100s
|
|
late Sept. 2008
|
|
early Nov. 2008 |
|
|
|
|
GOM
|
|
Future Contract
|
|
Apache
|
|
third of three wells
|
|
low 110s
|
|
early Nov. 2008
|
|
mid Dec. 2008 |
|
|
|
|
GOM
|
|
Future Contract
|
|
Apache
|
|
four-month extension + unpriced option
|
|
low 130s
|
|
mid Dec. 2008
|
|
mid April 2009 |
Ocean Tower
|
|
350 IC
|
|
GOM
|
|
Hurricane Ike Repairs
|
|
DODI
|
|
|
|
|
|
|
|
mid Oct. 2008
|
|
early Oct. 2009 |
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
October 23, 2008
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Rig Name |
|
WD |
|
Location |
|
Status |
|
Operator |
|
Current Term |
|
Dayrate ($000s) |
|
Start Date |
|
Est. End Date |
| |
International Semisubmersibles (19) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
MEXICO |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ocean New Era
|
|
1,500
|
|
GOM
|
|
Current Contract
|
|
PEMEX
|
|
2 1/2 year term
|
|
mid 260s
|
|
late Oct. 2007
|
|
mid Feb. 2010 |
Ocean Voyager
|
|
3,000
|
|
GOM
|
|
Current Contract
|
|
PEMEX
|
|
2 1/2 year term
|
|
mid 330s
|
|
early Nov. 2007
|
|
late Feb. 2010 |
NORTH SEA/MEDITERRANEAN |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ocean Nomad
|
|
1,200
|
|
North Sea
|
|
Contract
interrupted for
Special Survey &
Maintenance
|
|
DODI
|
|
|
|
|
0 |
|
|
mid Sept. 2008
|
|
late Oct. 2008
resume contract |
|
|
|
|
North Sea
|
|
Current Contract
|
|
Talisman
|
|
resume two-year
term extension
|
|
mid 330s
|
|
late Oct. 2008
|
|
late Sept. 2010 |
Ocean Guardian
|
|
1,500
|
|
North Sea
|
|
Current Contract
|
|
Oilexco
|
|
remainder two-year
term
|
|
low 350s
|
|
early Sept. 2008
|
|
mid July 2009 |
|
|
|
|
North Sea
|
|
Future Contract
|
|
Oilexco
|
|
two-year term
extension
|
|
mid 380s
|
|
mid July. 2009
|
|
early Sept. 2011 |
Ocean Princess
|
|
1,500
|
|
North Sea
|
|
Current Contract
|
|
Talisman
|
|
two-year term
extension
|
|
upper 330s
|
|
mid Feb. 2008
|
|
late Oct. 2008 |
|
|
|
|
North Sea
|
|
Contract to be
interrupted for
Special Survey &
Maintenance
|
|
DODI
|
|
|
|
|
0 |
|
|
late Oct. 2008
|
|
late Dec. 2008
resume contract |
|
|
|
|
North Sea
|
|
Current Contract
|
|
Talisman
|
|
resume two-year
term extension
|
|
upper 330s
|
|
late Dec. 2008
|
|
mid April 2010 |
Ocean Vanguard
|
|
1,500
|
|
North Sea
|
|
Current Contract
|
|
Statoil
|
|
two-year term
extension +
unpriced option
|
|
low 400s
|
|
late April 2008
|
|
mid April 2010 |
Ocean Lexington
|
|
2,200
|
|
Egypt
|
|
Current Contract
|
|
BP
|
|
36-month term
|
|
mid 260s
|
|
late Nov. 2006
|
|
mid Aug.2009 |
|
|
|
|
Egypt/Brazil
|
|
Prep, mobe &
acceptance test for
OGX
|
|
OGX
|
|
|
|
|
0 |
|
|
mid Aug. 2009
|
|
late Jan. 2010 |
|
|
|
|
Brazil
|
|
Future Contract
|
|
OGX
|
|
three-year term +
unpriced option
|
|
mid 330s
|
|
late Jan. 2010
|
|
late Jan. 2013 |
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
October 23, 2008
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Rig Name |
|
WD |
|
Location |
|
Status |
|
Operator |
|
Current Term |
|
Dayrate ($000s) |
|
Start Date |
|
Est. End
Date |
| |
AUSTRALASIA |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Ocean Bounty
|
|
1,500
|
|
Australia
|
|
Current Contract
|
|
Woodside
|
|
continue one-year term
|
|
low 350s
|
|
early Sept. 2008
|
|
late March 2009 |
|
|
|
|
Australia
|
|
Re-engine and upgrade
|
|
DODI
|
|
|
|
|
0 |
|
|
late March 2009
|
|
to be determined
followed by
two-year term |
|
|
|
|
Australia
|
|
Future Contract
|
|
Woodside
|
|
two-year term +
unpriced option
|
|
mid 420s
|
|
to be determined
|
|
to be determined |
Ocean Patriot
|
|
1,500
|
|
Australia
|
|
Current Contract
|
|
Santos
|
|
one-year term +
unpriced option
|
|
upper 370s
|
|
mid May 2008
|
|
late Dec. 2008 |
|
|
|
|
Australia
|
|
Future Contract
|
|
Apache
|
|
two-year term +
unpriced option
|
|
between 380-420
|
|
late Dec. 2008
|
|
late Dec. 2010 |
Ocean Epoch
|
|
1,640
|
|
Australia
|
|
Current Contract
|
|
Apache
|
|
one-year term
|
|
mid 350s
|
|
early March 2008
|
|
early March 2009 |
|
|
|
|
Australia
|
|
Future Contract
|
|
BHPB
|
|
550-day term +
unpriced options
|
|
low 350s
|
|
early March 2009
|
|
early Sept. 2010 |
Ocean General
|
|
2,400
|
|
Vietnam
|
|
Future Contract
|
|
PVEP
|
|
Approx. two-year term
+ unpriced options
|
|
low 280s
|
|
mid Oct. 2008
|
|
mid Oct. 2010 |
Ocean Rover
|
|
7,000
|
|
Malaysia
|
|
Current Contract
|
|
Resume Murphy
contract
|
|
balance previously
declared option wells
|
|
high 240s
|
|
mid Oct. 2008
|
|
early Jan. 2009 |
|
|
|
|
Malaysia
|
|
Future Contract
|
|
Newfield
|
|
one well
|
|
low 450s
|
|
early Jan. 2009
|
|
late Feb. 2009 |
|
|
|
|
Malaysia
|
|
Future Contract
|
|
Murphy
|
|
two-year term
extension
|
|
low 450s
|
|
late Feb. 2009
|
|
late Feb. 2011 |
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
October 23, 2008
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
Dayrate |
|
|
|
Est. End |
| Rig Name |
|
WD |
|
Location |
|
Status |
|
Operator |
|
Current Term |
|
($000s) |
|
Start Date |
|
Date |
| |
BRAZIL |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ocean Whittington
|
|
1,500
|
|
Brazil
|
|
Contract interrrupted to resume and complete contract upgrade work
|
|
DODI
|
|
|
|
|
0 |
|
|
mid Oct. 2008
|
|
early Dec. 2008 resume contract |
|
|
|
|
Brazil
|
|
Current Contract
|
|
Petrobras
|
|
resume five-year term plus potential 15% bonus
|
|
mid 220s
|
|
early Dec. 2008
|
|
late Aug. 2012 |
Ocean Concord
|
|
2,200
|
|
Brazil
|
|
Current Contract
|
|
Petrobras
|
|
five-year term plus potential 15% bonus
|
|
low 230s
|
|
mid Jan. 2008
|
|
mid Jan. 2013 |
Ocean Yorktown
|
|
2,850
|
|
Brazil
|
|
Current Contract
|
|
Petrobras
|
|
five-year term plus potential 15% bonus
|
|
mid 230s
|
|
mid Aug. 2008
|
|
mid Aug. 2013 |
Ocean Yatzy
|
|
3,300
|
|
Brazil
|
|
Current Contract
|
|
Petrobras
|
|
four-year term extension plus potential 17% bonus
|
|
mid 110s
|
|
early Oct. 2005
|
|
early Oct. 2009 |
|
|
|
|
Brazil
|
|
Future Contract
|
|
Petrobras
|
|
five-year term plus potential 10% bonus
|
|
mid 240s
|
|
early Oct. 2009
|
|
early Oct. 2014 |
Ocean Winner
|
|
3,500
|
|
Brazil
|
|
Current Contract
|
|
Petrobras
|
|
four-year term extension plus potential 5% bonus
|
|
low 110s
|
|
mid March 2006
|
|
mid March 2010 |
|
|
|
|
Brazil
|
|
Future Contract
|
|
Petrobras
|
|
five-year term extension plus potential 10% bonus
|
|
low 270s
|
|
mid March 2010
|
|
mid March 2015 |
Ocean Worker
|
|
3,500
|
|
Brazil
|
|
Current
|
|
DODI
|
|
prep., plus acceptance testing
|
|
|
0 |
|
|
late July 2008
|
|
late Dec. 2008 |
|
|
|
|
Brazil
|
|
Future Contract
|
|
Petrobras
|
|
six-year term plus potential 10% bonus
|
|
low 270s
|
|
late Dec. 2008
|
|
late Dec. 2014 |
Ocean Alliance
|
|
5,000
|
|
Brazil
|
|
Current Contract
|
|
Petrobras
|
|
one-well extension retroactive to late March 2008
|
|
mid 520s
|
|
late March 2008
|
|
late Oct. 2008 resume contract |
|
|
|
|
Brazil
|
|
Resume Contract
|
|
Petrobras
|
|
resume four-year extension plus 20% potential bonus
|
|
mid 150s
|
|
late Oct. 2008
|
|
late Nov. 2009 |
|
|
|
|
Brazil
|
|
Future Contract
|
|
Petrobras
|
|
six-year term extension plus potential 15% bonus
|
|
low 340s
|
|
late Nov. 2009
|
|
late Nov. 2015 |
| |
International Drillship (1) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ocean Clipper
|
|
7,000
|
|
Brazil
|
|
Current Contract
|
|
Petrobras
|
|
five-year extension plus potential 5% bonus
|
|
low 180s
|
|
mid Dec. 2005
|
|
mid Dec. 2010 |
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
October 23, 2008
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
Dayrate |
|
|
|
Est. End |
| Rig Name |
|
WD |
|
Location |
|
Status |
|
Operator |
|
Current Term |
|
($000s) |
|
Start Date |
|
Date |
| |
| International Jack-ups (8) |
Ocean Columbia
|
|
250 IC
|
|
Mexico
|
|
Current Contract
|
|
Pemex
|
|
1 1/2-year term
|
|
mid 120s
|
|
late Jan. 2008
|
|
mid June 2009 |
Ocean Nugget
|
|
300 IC
|
|
Mexico
|
|
Current Contract
|
|
Pemex
|
|
term contract
|
|
upper 160s
|
|
early Oct. 2006
|
|
late March 2009 |
Ocean King
|
|
300 IC
|
|
Croatia
|
|
Current Contract
|
|
CROSCO
|
|
two-year bareboat charter
|
|
upper 100s
|
|
mid Nov. 2007
|
|
early Nov. 2009 |
Ocean Sovereign
|
|
300 IC
|
|
Indonesia
|
|
Current Contract
|
|
Kodeco
|
|
extension up to survey
|
|
upper 130s
|
|
early Aug. 2008
|
|
mid Nov. 2008 |
|
|
|
|
Indonesia
|
|
Intermediate Survey & upgrade
|
|
DODI
|
|
|
|
|
0 |
|
|
mid Nov. 2008
|
|
early Feb. 2009 |
|
|
|
|
Indonesia
|
|
Future Contract
|
|
Kodeco
|
|
15-month extension + unpriced option
|
|
mid 140s
|
|
early Feb. 2009
|
|
late April 2010 |
Ocean Heritage
|
|
300 IC
|
|
Gulf of Suez
|
|
Current Contract
|
|
IPR
|
|
seven-month term
|
|
mid 110s
|
|
mid July 2008
|
|
mid Feb. 2009 |
Ocean Spur
|
|
300 IC
|
|
Egypt
|
|
Current Contract
|
|
WEPCO
|
|
well work on platform
|
|
low 140s
|
|
mid Aug. 2008
|
|
late Oct. 2008 |
|
|
|
|
Egypt
|
|
Future Contract
|
|
WEPCO
|
|
one-year term
|
|
low 140s
|
|
late Oct. 2008
|
|
late Aug. 2009 |
Ocean Shield
|
|
350 IC
|
|
Malaysia
|
|
Current Contract
|
|
Newfield
|
|
six-month term + two wells
|
|
mid 170s
|
|
late May 2008
|
|
mid Dec. 2008 |
|
|
|
|
Malaysia
|
|
Future Contract
|
|
Newfield
|
|
demobe to Singapore, then mobe to Australia followed by term
|
|
|
0 |
|
|
mid Dec. 2008
|
|
early Jan. 2009 |
|
|
|
|
Australia
|
|
Future Contract
|
|
ENI
|
|
term
|
|
mid 260s
|
|
early Jan. 2009
|
|
mid Dec. 2009 |
Ocean Scepter
|
|
350 IC
|
|
Argentina
|
|
Current Contract
|
|
Enap Sipetrol/YPF
|
|
300-day term contract + unpriced option
|
|
high 190s
|
|
late Sept. 2008
|
|
late July 2009 |
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
October 23, 2008
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
Dayrate |
|
|
|
Est. End |
|
| Rig Name |
|
WD |
|
Location |
|
Status |
|
Operator |
|
Current Term |
|
($000s) |
|
Start Date |
|
Date |
|
| - |
Upgrade (1) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ocean Monarch |
|
10,000 |
|
Singapore |
|
Current |
|
DODI |
|
commission, wait on dry tow vessel |
|
0 |
|
late Sept. 2008 |
|
mid Dec. 2008 |
| |
|
|
|
|
|
|
|
|
mobe GOM |
|
Future |
|
DODI |
|
mobe to GOM and prep for contract |
|
0 |
|
mid Dec. 2008 |
|
mid March 2009 |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
four-year term + |
|
|
|
|
|
|
|
|
|
|
|
|
GOM |
|
Future Contract |
|
Anadarko |
|
unpriced option |
|
high 420s |
|
mid March 2009 |
|
mid March 2013 |
| |
NOTES: Generally, rig utilization rates approach 95-98% during contracted periods; however, utilization rates can be adversely impacted by additional downtime due to
unscheduled repairs and maintenance, weather conditions and other factors. An LOI is subject to customary conditions, including the execution of a definitive
agreement and as such may not result in a binding contract. Options are un-priced and any extension of contract is subject to mutually agreeable terms & conditions
unless otherwise indicated. Mobe revenues (if any) and mobe expenses are deferred, and generally are amortized over the life of the contract. GOM = Gulf of Mexico.
Cost/Revenue Footnote: Contract Drilling Expenses applies to contract drilling expenses ONLY and
does not include Reimbursable Expenses
On rig utilization, assume 95% for DP units, 96% for conventionally moored rigs, and 98% for jack-ups.
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
October 23, 2008
EXPECTED DOWNTIME LONGER THAN ONE WEEK (Subject to Change)
| |
|
|
|
|
|
|
|
|
|
|
| Expected 1 Oct. - 31 Dec. 2008 Down Days (Total thru Q3 = 1,111) |
|
# Days |
|
|
|
|
|
|
| Rig |
|
Q4 |
|
|
Total |
|
|
Comments |
| |
Shipyard Time |
|
|
|
|
|
|
|
|
|
|
Princess |
|
|
59 |
|
|
|
59 |
|
|
5-year survey and maintence |
Ambassador |
|
|
57 |
|
|
|
57 |
|
|
5-year survey and maintenance |
Valiant |
|
|
57 |
|
|
|
57 |
|
|
5-year survey/replace derrick and other maint. |
Nomad |
|
|
48 |
|
|
|
48 |
|
|
5-year survey and maintenance |
Drake |
|
|
29 |
|
|
|
29 |
|
|
5-year survey and maintenance |
Rover |
|
|
16 |
|
|
|
16 |
|
|
5-year survey and maintenance |
| |
|
|
|
266 |
|
|
|
266 |
|
|
|
Other Downtime |
|
|
|
|
|
|
|
|
|
|
Worker |
|
|
87 |
|
|
|
87 |
|
|
Prep for contract, accpt. test |
Tower |
|
|
75 |
|
|
|
75 |
|
|
Equipment repair (Hurricane Ike damage) |
Whittington |
|
|
63 |
|
|
|
63 |
|
|
Complete contract upgrade |
Sovereign |
|
|
45 |
|
|
|
45 |
|
|
Intermediate survey, install new crane & top drive |
Shield |
|
|
30 |
|
|
|
30 |
|
|
Mobe to Australia |
General |
|
|
8 |
|
|
|
8 |
|
|
Mobe to Vietnam |
| |
|
|
|
308 |
|
|
|
308 |
|
|
|
| |
Remaining 2008 Non-New-build/Upgrade |
|
|
574 |
|
|
|
574 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
New-build/Upgrade Downtime |
|
|
Q4 |
|
|
Total |
|
|
| |
Monarch |
|
|
92 |
|
|
|
92 |
|
|
Commission, mobe to U.S. GOM |
| |
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
October 23, 2008
ESTIMATED 2009 DOWNTIME (PRELIMINARY PENDING FINALIZATION OF 2009 BUDGET)
| |
|
|
|
|
|
|
| |
| 5-YEAR SURVEYS |
|
DAYS |
|
COMMENTS |
| |
America
|
|
|
81 |
|
|
|
Champion
|
|
|
61 |
|
|
|
Concord
|
|
|
51 |
|
|
|
Titan
|
|
|
45 |
|
|
|
Yatzy
|
|
|
42 |
|
|
|
| |
INTERMEDIATE SURVEYS |
|
|
|
|
|
|
| |
Summit
|
|
|
16 |
|
|
|
Columbia
|
|
|
15 |
|
|
|
Nugget
|
|
|
13 |
|
|
|
Heritage
|
|
|
10 |
|
|
|
| |
OTHER DOWNTIME |
|
|
|
|
|
|
| |
Bounty
|
|
|
??? |
|
|
Approx. 1 year re-engine and water depth upgrade work start time to be determined, may extend into 2010 |
Tower
|
|
|
275 |
|
|
Hurricane repair |
Lexington
|
|
|
161 |
|
|
Prep, mobe & acceptance test |
Quest
|
|
|
135 |
|
|
Prep, mobe & acceptance test |
Ambassador
|
|
|
110 |
|
|
Prep, mobe & acceptance test |
Monarch
|
|
|
75 |
|
|
Complete mobe to GOM and rig prep. |
Valiant
|
|
|
60 |
|
|
Mobe |
Sovereign
|
|
|
33 |
|
|
Completion of maintenance and upgrade begun in 2008 |
Confidence
|
|
|
18 |
|
|
Thruster changeout |
| |
Forward-Looking Statements: The rig status report may contain forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended,
and Section 21E of the Securities Exchange Act of 1934, as amended. Forward-looking statements include, without limitation, any statement that may project, indicate or
imply future results, events, performance or achievements, and may contain or be identified by the words expect, intend, plan, predict, anticipate, estimate, believe,
should, could, may, might, will, will be, will continue, will likely result, project, budget, forecast, and similar expressions. Statements by the Company in the
rig status report that contain forward-looking statements include, but are not limited to, statements regarding the current term, future dayrates, start and end dates and
comments concerning future contracts and availability, letters of intent, utilization, surveys, downtime and other aspects of the Companys drilling rigs, as well as statements
concerning rigs being upgraded or to be upgraded and rigs under construction. Such statements are inherently subject to a variety of assumptions, risks and uncertainties
that could cause actual results to differ materially from those anticipated or projected. A discussion of the risk factors that could impact these areas and the Companys
overall business and financial performance can be found in the Companys reports and other documents filed with the Securities and Exchange Commission. These factors
include, among others, general economic and business conditions, operating risks, casualty losses, industry fleet capacity, changes in foreign and domestic oil and gas
exploration and production activity, competition, changes in foreign, political, social and economic conditions, regulatory initiatives and compliance with governmental
regulations, customer preferences and various other matters, many of which are beyond the Companys control. Given these concerns, investors and analysts should not
place undue reliance on forward-looking statements. Each forward-looking statement speaks only as of the date of the rig status report, and the Company undertakes no
obligation to publicly update or revise any forward-looking statement.